2017 BMW M3 at McKenna BMW
http://ineedadomain2.dealerleads.com/cars/New/2017/BMW/M3//24156712017 BMW M3
Selling Price : $83,715
Vehicle Photos
Vehicle Basics
- Condition : New
- Mileage : 5
- VIN : WBS8M9C56H5G84033
- Stock # : B48818
- Engine : Straight 6 Cylinder Engine
- Transmission : 6-Speed M/T
- Ext. Color : Alpine White
- Int. Color : Black
- Vehicle Type : Sedan
- Body Style : 4D Sedan
- Drivetrain : Rear Wheel Drive
City MPG *
17
Hwy MPG *
24
*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.
Dealership Info
McKenna BMW
McKenna BMW
McKenna BMW
800-346-0050
10900 Firestone Blvd
Norwalk, CA 90650
800-346-0050
10900 Firestone Blvd
Norwalk, CA 90650
Vehicle Features
- Engine: 3.0L Inline 6-Cylinder M TwinPower Turbo w/ZCP-inc: 444 HP with high precision direct injection
- Transmission: 6-Speed Manual
- Engine Auto Stop-Start Feature
- Rear-Wheel Drive
- 3.46 Axle Ratio
- Engine Oil Cooler
- 90-Amp/Hr 900CCA Maintenance-Free Battery
- Regenerative 210 Amp Alternator
- 4630# Gvwr 980# Maximum Payload
- Gas-Pressurized Shock Absorbers
- Front And Rear Anti-Roll Bars
- Automatic w/Driver Control Ride Control Sport Tuned Adaptive Suspension
- Electric Power-Assist Speed-Sensing Steering
- 15.9 Gal. Fuel Tank
- Dual Stainless Steel Exhaust w/Chrome Tailpipe Finisher
- Strut Front Suspension w/Coil Springs
- Multi-Link Rear Suspension w/Coil Springs
- 4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist and Hill Hold Control
- Electro-Mechanical Limited Slip Differential
- Wheels: 18" x 9" Front & 18" x 10" Rear -inc: Light alloy V-spoke, style 513M
- Tires: 255/40R18 Front & 275/40R18 Rear -inc: Mixed performance
- Wheels w/Silver Accents
- Clearcoat Paint
- Body-Colored Front Bumper
- Body-Colored Rear Bumper
- Black Side Windows Trim and Black Front Windshield Trim
- Body-Colored Door Handles
- Body-Colored Power Heated Auto Dimming Side Mirrors w/Power Folding and Turn Signal Indicator
- Fixed Rear Window w/Defroster
- Light Tinted Glass
- Speed Sensitive Rain Detecting Variable Intermittent Wipers w/Heated Jets
- Front Windshield -inc: Sun Visor Strip
- Galvanized Steel/Aluminum/Composite Panels
- Lip Spoiler
- Black Grille w/Chrome Surround
- Trunk Rear Cargo Access
- Tailgate/Rear Door Lock Included w/Power Door Locks
- Fully Automatic Projector Beam High Intensity Low/High Beam Daytime Running Auto-Leveling Directionally Adaptive Headlamps w/Delay-Off
- Perimeter/Approach Lights
- LED Brakelights
- Radio: AM/FM Audio System
- Radio w/Seek-Scan, In-Dash Mounted Single CD, MP3 Player, Clock, Speed Compensated Volume Control, Aux Audio Input Jack, Steering Wheel Controls, Voice Activation, Radio Data System, DVD-Audio, External Memory Control and 20 Gb Internal Memory
- Satellite Radio w/1 Year Subscription
- harman/kardon Surround Sound System
- 600w Premium Amplifier
- Graphic Equalizer
- Audio Theft Deterrent
- Digital Signal Processor
- Wireless Streaming
- Window Grid Diversity Antenna
- Bluetooth Wireless Phone Connectivity
- 1 LCD Monitor In The Front
- Real-Time Traffic Display
- Heated Front Sport Seats -inc: lumbar support
- 10-Way Power Driver Seat -inc: Power Recline, Height Adjustment, Seatback Side Bolster Support, Fore/Aft Movement, Cushion Tilt and Manual Cushion Extension
- 10-Way Power Passenger Seat -inc: Power Recline, Height Adjustment, Seatback Side Bolster Support, Fore/Aft Movement, Cushion Tilt and Manual Cushion Extension
- 40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat
- Manual Tilt/Telescoping Steering Column
- Gauges -inc: Speedometer, Odometer, Tachometer, Oil Temperature, Trip Odometer and Trip Computer
- Power Rear Windows
- BMW Online Full Service Internet Access
- Sport Leather Steering Wheel
- Front Cupholder
- Rear Cupholder
- Proximity Key For Doors And Push Button Start
- Interior Lock Disable
- Valet Function
- Power Fuel Flap Locking Type
- Remote Keyless Entry w/Integrated Key Transmitter, 4 Door Curb/Courtesy, Illuminated Entry and Panic Button
- Remote Releases -Inc: Power Cargo Access
- Garage Door Transmitter
- Cruise Control w/Steering Wheel Controls
- Dual Zone Front Automatic Air Conditioning
- Rear HVAC w/Separate Controls
- HVAC -inc: Underseat Ducts, Residual Heat Recirculation and Console Ducts
- Illuminated Locking Glove Box
- Driver Foot Rest
- Cloth/Leather Upholstery
- Interior Trim -inc: Carbon Fiber Instrument Panel Insert, Carbon Fiber Door Panel Insert, Carbon Fiber Console Insert and Metal-Look Interior Accents
- Full Cloth Headliner
- Leatherette Door Trim Insert
- Leather/Metal-Look Gear Shift Knob
- Day-Night Auto-Dimming Rearview Mirror
- Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination
- Full Floor Console w/Covered Storage and 4 12V DC Power Outlets
- Front And Rear Map Lights
- Fade-To-Off Interior Lighting
- Full Carpet Floor Covering -inc: Carpet Front And Rear Floor Mats
- Carpet Floor Trim and Carpet Trunk Lid/Rear Cargo Door Trim
- Cargo Area Concealed Storage
- Cargo Net
- Cargo Space Lights
- Memory Settings -inc: Driver Seat and Door Mirrors
- FOB Controls -inc: Trunk/Hatch/Tailgate, Windows and Sunroof/Convertible Roof
- Integrated Navigation System w/Voice Activation
- Tracker System
- Smart Device Integration
- Driver / Passenger And Rear Door Bins
- Power 1st Row Windows w/Front And Rear 1-Touch Up/Down
- Delayed Accessory Power
- Power Door Locks w/Autolock Feature
- Systems Monitor
- Trip Computer
- Outside Temp Gauge
- Analog Display
- Fixed Front Head Restraints and Manual Adjustable Rear Head Restraints
- Sliding Front Center Armrest and Rear Center Armrest w/Pass-Thru
- 2 Seatback Storage Pockets
- Perimeter Alarm
- Engine Immobilizer
- 4 12V DC Power Outlets
- Air Filtration
- Electronic Stability Control (ESC)
- ABS And Driveline Traction Control
- Side Impact Beams
- Dual Stage Driver And Passenger Seat-Mounted Side Airbags
- BMW Assist eCall Emergency S.O.S
- Tire Specific Low Tire Pressure Warning
- Dual Stage Driver And Passenger Front Airbags
- Curtain 1st And 2nd Row Airbags
- Airbag Occupancy Sensor
- Driver And Passenger Knee Airbag
- Rear Child Safety Locks
- Outboard Front Lap And Shoulder Safety Belts -inc: Rear Center 3 Point and Pretensioners
- Wheels: 18" x 9" Front & 18" x 10" Rear
- Wheels: 20" x 9" Front/20" x 10" Rear
- Heated Front Sport Seats
- Cloth/Leather Upholstery
- Radio: AM/FM Audio System
- Competition Package
- Executive Package
- Lighting Package
- Side & Top View Cameras
- Apple CarPlay Compatibility
- Heated Steering Wheel
- Rear-View Camera
- Manual Rear Side Window Shades
- Lumbar Support Delete
- Heated Rear Seats
- Retractable Headlight Washers
- Park Distance Control
- Adaptive Full LED Lights
- Automatic High Beams
- Head-Up Display
- Satellite Radio w/1 Year Subscription
- harman/kardon Surround Sound System
- BMW Individual High-Gloss Shadow Line
- Competition Package (7MA)
- M Competition Package
- Wireless Charging
- 4-Wheel Disc Brakes
- Air Conditioning
- Electronic Stability Control
- Front Bucket Seats
- Front Center Armrest
- Leather Shift Knob
- Navigation System
- Spoiler
- Tachometer
- ABS brakes
- Adaptive suspension
- Auto-dimming door mirrors
- Automatic temperature control
- Brake assist
- Bumpers: body-color
- CD player
- DVD-Audio
- Delay-off headlights
- Driver door bin
- Driver vanity mirror
- Dual front impact airbags
- Dual front side impact airbags
- Emergency communication system
- Four wheel independent suspension
- Front anti-roll bar
- Front dual zone A/C
- Front reading lights
- Fully automatic headlights
- Garage door transmitter
- Heated door mirrors
- Heated front seats
- Illuminated entry
- Knee airbag
- Leather steering wheel
- Low tire pressure warning
- MP3 decoder
- Memory seat
- Occupant sensing airbag
- Outside temperature display
- Overhead airbag
- Panic alarm
- Passenger door bin
- Passenger vanity mirror
- Power door mirrors
- Power driver seat
- Power passenger seat
- Power steering
- Power windows
- Radio data system
- Rain sensing wipers
- Rear air conditioning
- Rear anti-roll bar
- Rear reading lights
- Rear seat center armrest
- Rear window defroster
- Remote keyless entry
- Security system
- Speed control
- Speed-sensing steering
- Split folding rear seat
- Sport steering wheel
- Steering wheel mounted audio controls
- Telescoping steering wheel
- Tilt steering wheel
- Traction control
- Trip computer
- Turn signal indicator mirrors
- Variably intermittent wipers
- Auto-dimming Rear-View mirror
- Speed-Sensitive Wipers
- 16 Speakers
- High intensity discharge headlights: Bi-xenon
- AM/FM radio: SiriusXM
- Speaker type: harman/kardon
Disclaimer & Legal Info
Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.